validate,

initialize,

generate-sources,

process-sources,

generate-resources,

process-resources,

compile,

process-classes,

generate-test-sources,

process-test-sources,

generate-test-resources,

process-test-resources,

test-compile,

test-classes,

test,

prepare-package,

package,

pre-integration-test,

test,

post-integration-test,

verify,

install,

deploy,

pre-clean,

clean,

an,

pre-site,

site,

post-site,

site-deploy

 

 

Although hardly a comprehensive list, these are the most common default lifecycle phases executed.

 

  • validate: validate the project is correct and all necessary information is available
  • compile: compile the source code of the project
  • test: test the compiled source code using a suitable unit testing framework. These tests should not require the code be packaged or deployed
  • package: take the compiled code and package it in its distributable format, such as a JAR.
  • integration-test: process and deploy the package if necessary into an environment where integration tests can be run
  • verify: run any checks to verify the package is valid and meets quality criteria
  • install: install the package into the local repository, for use as a dependency in other projects locally
  • deploy: done in an integration or release environment, copies the final package to the remote repository for sharing with other developers and projects.

 

相关文章:

  • 2022-12-23
  • 2021-04-21
  • 2022-01-09
  • 2021-10-14
  • 2022-12-23
  • 2022-12-23
  • 2021-12-20
  • 2021-11-04
猜你喜欢
  • 2021-06-27
  • 2021-07-31
  • 2022-01-13
  • 2022-01-02
  • 2022-12-23
相关资源
相似解决方案