SAP ECC 6.0

Configuration Document



Production Planning & Control (PP)


1. General Settings


1.1 Maintain Calendar



Menu Path

IMG  SAP NetWeaver  General Settings  Maintain calendar

Transaction Code:

SCAL



SAP ECC PP 配置文档

 Public holidays
Definitions for public holidays: Spring festival etc.

 Public holiday calendar
A combination of public holiday rules

 Factory calendar
Definition working days and non-working days for a week, under the assignment of a particular public holiday calendar.

1.1.1 Public Holidays 


 mouse click at Public holiday

 click  for changing


SAP ECC PP 配置文档


Create new Public holidays Tomb sweeping day, Dragon boat festival and Mid-autumn festival under sort key “CN”


SAP ECC PP 配置文档


Choose public holiday type

SAP ECC PP 配置文档


Currently, the public holidays are defined to year 2015.

Click SAP ECC PP 配置文档 to do extension in the future.



1.1.2 Holiday calendar


Go back to Main menu:

 mouse click at Holiday Calendar

 click at  for changing


SAP ECC PP 配置文档


Create holiday calendar for the plant:

C1-MSFS

C2-MDFT (Tianjin)

C3-MDFT (Changchun)

C4-MGFS


SAP ECC PP 配置文档


Click SAP ECC PP 配置文档 to insert public holiday to holiday calendar.


SAP ECC PP 配置文档


Note: Holiday calendar for the plant only contains legal holidays.




1.1.3 Factory calendar


Go back to Main menu:

 choose Factory calendar

 click


SAP ECC PP 配置文档


Create factory calendar for the plant:

Factory calendar code

Description

Remark

C0

CN2 all days are workdays

7 working days a week, no holiday

C1

MSFS calendar for work center

6 working days a week with holiday

C2

MDFT (TJ) calendar

7 working days a week with holiday

C3

MDFT (CC) calendar

7 working days a week with holiday

C4

MGFS calendar

7 working days a week with holiday

C5

MSFS calendar for plant

7 working days a week with holiday


SAP ECC PP 配置文档


SAP ECC PP 配置文档




1.2 Check Units of Measurement


Menu Path

IMG  SAP NetWeaver  General settings  Check units of measurement

Transaction Code:

CUNI


SAP ECC PP 配置文档


Select “Units of measurement” button,

SAP ECC PP 配置文档


Create a new UoM “CNY”, which is used for work center standard value parameter “tooling”.

SAP ECC PP 配置文档



2. Master Data


2.1 Bill of Materials


2.1.1 Define Modification Parameters


Menu Path

IMG  Production  Basic Data  BOM Control data for Bill of Material  Define Modification Parameters


Transaction Code:

OS27


SAP ECC PP 配置文档


This screen can set parameters for BOM which can define BOM validity maintain, support with Engineering change management, and technical setting for allow alternative BOM or Variant BOM active.



2.1.2 Define Default Values


Menu Path

IMG  Production  Basic Data  BOM Control data for BOM  Define Default Values


Transaction Code:

OS28


SAP ECC PP 配置文档



Define the default values for BOM details which there are 4 fields as:

Field Name

Default Value

Remark

Base quantity

1.000


BOM status

70

70  : Release status


Size unit

MM


Var-size item unit

PC

Unit



2.1.3 Define BOM usage



Menu Path

IMG  Production  Basic Data  BOM General data  BOM usage Define BOM usages


Transaction Code:

OS20



SAP ECC PP 配置文档


Usage 1 “production” and usage 2 “engineering/design” are used in China BU2.



2.1.4 Define Allowed Material types for BOM header


Menu Path

IMG  Production  Basic Data  BOM General Data  Define Allowed Material types for BOM header


Transaction Code:

OS24


SAP ECC PP 配置文档

All Material types are allowed (+) for BOM header in each BOM usage.



2.1.5 Define BOM status


Menu Path

IMG  Production  Basic Data  BOM General Data  Define BOM status


Transaction Code:

OS23


SAP ECC PP 配置文档


CN2 BOM status is set to 70 when created.


2.1.6 Define Item Categories


Menu Path

IMG  Production  Basic Data  BOM Item data  Define item categories


Transaction Code:

OS13



SAP ECC PP 配置文档


Category L and T are used in CN2.



2.1.7 Define Allowed Material types for BOM item


Menu Path

IMG  Production  Basic Data  BOM Item Data  Define Allowed Material types for BOM Item


Transaction Code:

OS14


SAP ECC PP 配置文档


All Material types are allowed (+) for BOM Item in each BOM usage.



2.1.8 Define order of priority for BOM usages


Menu Path

IMG  Production  Basic Data  BOM Alternative Determination Define Order of priority for BOM usages


Transaction Code:

OS31


SAP ECC PP 配置文档



2.1.9 Define Applications


Menu Path

IMG  Production  Basic Data  BOM Alternative Determination Define application


Transaction Code:

OS30



SAP ECC PP 配置文档


Create a new item ZC01 with selection ID “02” which can be used in CS11/CS12/CS13 for viewing Engineering/design BOM.




2.2 Work Center


2.2.1 Define Work center category


Menu Path

IMG  Production  Basic Data  Work center General data Define work center category


Transaction Code:

OP40


SAP ECC PP 配置文档

 Work center categories for CN2

Machine

Machine group

Labor

Labor group

Production line


 Double click at SAP ECC PP 配置文档  for example cat. 0007 production line use with task list application

P routing for production

R Repetitive manufacturing


SAP ECC PP 配置文档



2.2.2 Define field selection


Menu Path

IMG  Production  Basic Data  Work center General data Define field selection


Transaction Code:

OPFA


SAP ECC PP 配置文档


Example of cost center assignment tab, which field will can be input or hide


SAP ECC PP 配置文档




2.2.3 Define parameters


Menu Path

IMG  Production  Basic Data  Work center General data standard value  Define parameters


Transaction Code:

OP7B


SAP ECC PP 配置文档


Setup time:  SAP_01

Machine time: SAP_02

Labor time:  SAP_03

Operation Quantity: SAP_09

Base quantity:  SAP_08

Besides above SAP standard parameter, create a new parameter ZCN_01: Tooling:


SAP ECC PP 配置文档


The unit for this parameter is “CNY”.



2.2.4 Define standard value key


Menu Path

IMG  Production  Basic Data  Work center General data standard value  Define standard value key


Transaction Code:

OP19


SAP ECC PP 配置文档


Create a new item ZC01 for CN2,


SAP ECC PP 配置文档


Standard value key

Description

No.

Parameter

Name

ZC01

Normal Production (CN BU2)

1

SAP_01

Setup



2

SAP_02

Machine



3

SAP_03

Labor



4

ZCN_01

Tooling



5

SAP_05

Standard value 2



6

SAP_06

Standard value 3

Maximum 6 parameters can be combined to one standard value key.



2.2.5 Define person responsible


Menu Path

IMG  Production  Basic Data  Work center General data Determine person responsible


Transaction Code:

No T-Code


SAP ECC PP 配置文档


Define the people responsible for your work centers which this key, you can identify a person or group of people responsible for maintaining the master data in certain work centers.


Plant

Person  responsible

Description

2290

001

Production Engineering (air filter)

2290

002

Production Engineering (liquid filter)

2282

001

Production Engineering

2294

001

Production Engineering

2295

001

Production Engineering




2.2.6 Define control key


Menu Path

IMG  Production  Basic Data  Work center  Routing data Define control key


Transaction Code:

OP00


SAP ECC PP 配置文档


Define ZPC0/ZPC1/ZPC2 for CN2,


SAP ECC PP 配置文档


SAP ECC PP 配置文档


SAP ECC PP 配置文档



Indicators

ZPC0

CN2 routing - internal proc.

ZPC1

CN2 routing - Milestone & Auto GR

ZPC2

CN2 routing - Miles w/o AutoGR

Scheduling

X

X

X

Determine capacity requirement

X

X

X

Inspect.char.required




Auto goods receipt


X


Print time ticket

X

X

X

Rework




Print confirmation

X

X

X

Print

X

X

X

Cost

X

X

X

Schedule external operation




External processing




Confirmations

2

1

1



2.2.7 Determine Capacity planner


Menu Path

IMG  Production  Basic Data  Work center Capacity planning  Determine Capacity Planner



Transaction Code:

No-T code


SAP ECC PP 配置文档


Plant

Capacity planner

Description

2290

SH1

MSFS-air filter

2290

SH2

MSFS-liquid filter

2282

TJ1

MDFT-Tianjin

2294

GZ1

MGFS

2295

CC1

MDFT-Changchun



2.2.8 Define formulas for work centers


Menu Path

IMG  Production  Basic Data  Work center  Capacity planning  Work center formulas  Define formulas for work centers


Transaction Code:

OP21


SAP ECC PP 配置文档


Define below formulas for CN2.


Capacity and costing formulas:


Standard value

Formula

Detail formula

Parameter formula

Remark

Setup

ZPPC05

Setup time

SAP_01


Machine

ZPPC06

Machine time * Operation Qty/Base Qty

SAP_02 * SAP_09/SAP_08


Labor

ZPPC07

Labor time * Operation Qty/Base Qty

SAP_03 * SAP_09/SAP_08


Tooling

ZPPC04

Tooling value*Operation Qty/Base Qty

ZCN_01*SAP_09/SAP_08

Only for costing


Scheduling formulas:


Standard value

Formula

Detail formula

Parameter formula

Setup

ZPPC01

Setup time

SAP_01

Machine

ZPPC02

Machine time * Operation Qty/Base Qty/Operation split

SAP_02 * SAP_09/SAP_08/SAP_11

Labor

ZPPC03

Labor time * Operation Qty/Base Qty/Operation split

SAP_03 * SAP_09/SAP_08/SAP_11


Detail configuration for the formula as below, example is ZPPC05

SAP ECC PP 配置文档




2.3 Routing data


2.3.1 Define number ranges for routings


Menu Path

IMG  Production  Basic Data  Routing Control data Define number ranges for routings


Transaction Code:

OP62


SAP ECC PP 配置文档


SAP ECC PP 配置文档


 Number range no. 01  start from 50000000-99999999 -> internal no. range

 Number range no. 02  start from 00000000-49999999 -> external no. range



2.3.2 Maintain task list types and set SET/GET


Menu Path

IMG  Production  Basic Data  Routing Control data Maintain task list types and set SET/GET parameters


Transaction Code:

OP8B


SAP ECC PP 配置文档


Select task list type “N”,


SAP ECC PP 配置文档


 No. range 01 for internal number assignment

 No. range 02  for external number assignment

 Tick at Document field for document active changing

 Tick at Mat. Field for determining that the last maintained material number is the default value in routing maintenance.



2.3.3 Define Material type assignments


Menu Path

IMG  Production  Basic Data  Routing General data Define Material type assignments


Transaction Code:

OP50


SAP ECC PP 配置文档


Task list type “N” used for material type ZPRD and ZHIB / ZUNB in CN2.



2.3.4 Define Routing selection


Menu Path

IMG  Production  Basic Data  Routing  Routing selection  Select automatically


Transaction Code:

OPEB


SAP ECC PP 配置文档




3. Production Planning


3.1 Define Version Number


Menu Path

IMG  Production Production Planning  Planned Independent  Requirements  Define version number


Transaction Code:

OMP2


Copy versions to language “ZH”,

SAP ECC PP 配置文档


Z* versions are used for long term planning.




4. Capacity Requirements Planning


4.1 Define evaluation selection profile


Menu Path

IMG  Production  Capacity requirements Planning  Evaluation  Profiles  Define selection profiles


Transaction Code:

OPA2


SAP ECC PP 配置文档


Create a new profile ZAPA010 by copying from SAPA010. For the order categories, only tick SAP ECC PP 配置文档


SAP ECC PP 配置文档



4.2 Define leveling selection profile


Menu Path

IMG  Production  Capacity requirements Planning  Capacity leveling and extended evaluation  Define selection profile


Transaction Code:

OPD1


SAP ECC PP 配置文档


Create a new profile ZAPSFCS009 by copying from SAPSFCS009. For the order categories, only tick SAP ECC PP 配置文档


SAP ECC PP 配置文档



4.2 Define leveling overall profile


Menu Path

IMG  Production  Capacity requirements Planning  Capacity leveling and extended evaluation  Define overall profile


Transaction Code:

OPD0


SAP ECC PP 配置文档


Create a new profile ZAPSFCG001 by copying from SAPSFCG001, set the selection profile as “ZAPSFCS009”.


SAP ECC PP 配置文档



4. Material Requirements Planning


4.1 Plant Parameters


Menu Path

IMG  Production Material Requirements Planning  Plant Parameters Carry out overall maintainance of plant parameters


Transaction Code:

OPPQ




SAP ECC PP 配置文档



 Click SAP ECC PP 配置文档 for maintaining

 Enter plant














SAP ECC PP 配置文档


Status maintained : indicated that the values are maintained

Status initial: indicated that no value is maintained


Click at each topic that has been maintained to adjust value via this page directly, or navigated to its structure tree.



4.2 Carry out Overall Maintainance of MRP Group


Menu Path

IMG  Production Material Requirements Planning  MRP Groups Carry out overall maintainance of MRP group


Transaction Code:

OPPR



Click SAP ECC PP 配置文档


SAP ECC PP 配置文档


And click SAP ECC PP 配置文档 to see overview MRP Group values maintained


SAP ECC PP 配置文档



Or you can see in each topic details when you enter plant and click SAP ECC PP 配置文档


SAP ECC PP 配置文档



Enter MRP group


SAP ECC PP 配置文档



Then click SAP ECC PP 配置文档



SAP ECC PP 配置文档


Status maintained : indicated that the values are maintained

Status initial: indicated that no value is maintained


Click at each topic that has been maintained to adjust value via this page directly, or navigated to its structure tree.




4.3 Number ranges


Menu Path

IMG  Production Material Requirements Planning  Number ranges Define number ranges for planning run


Transaction Code:

OM12




SAP ECC PP 配置文档




Plant

Objects

No. range maintained

1166

Planned orders

01-from no.0000000001-9999999999


Dep. Req./Resv.

01-from no.0000000001-8999999999


Purch. Req.

05-from no.0030000000-0039999999


No. range for MRP list

01-from no.0000000001-0049999999


Total req.

01-from no.0000000001-1999999999


Sim. Dep. Req.

01- from no.0000000001-4999999999

2226

Planned orders

01-from no.0000000001-0049999999


Dep. Req./Resv.

01-from no.0000000001-8999999999


Purch. Req.

06-from no.0040000000-0049999999


No. range for MRP list

01-from no.0000000001-9999999999


Total req.

01-from no.0000000001-1999999999


Sim. Dep. Req.

01- from no.0000000001-4999999999




4.4 MRP controllers


Menu Path

IMG  Production Material Requirements Planning  Master data define MRP controllers


Transaction Code:




SAP ECC PP 配置文档


Click SAP ECC PP 配置文档

SAP ECC PP 配置文档


Then SAP ECC PP 配置文档






4.5 Activate MRP area


Menu Path

IMG  Production Material Requirements Planning  Master data  MRP area activate MRP for MRP area


Transaction Code:




SAP ECC PP 配置文档



indicator activates material requirements planning for MRP areas at client level




4.6 Define MRP areas


Menu Path

IMG  Production Material Requirements Planning  Master data   MRP area Define MRP areas


Transaction Code:






SAP ECC PP 配置文档


Click SAP ECC PP 配置文档


SAP ECC PP 配置文档



4.7 Activate Material Requirement Planning


Menu Path

IMG  Production Material Requirements Planning  Planning   Activate Material Requirement Planning


Transaction Code:

OMDU



SAP ECC PP 配置文档


Click SAP ECC PP 配置文档


SAP ECC PP 配置文档





4.8 Scope of planning for Total planning


Menu Path

IMG  Production Material Requirements Planning  Planning   Scope of planning for Total planning


Transaction Code:

OM0E




SAP ECC PP 配置文档


Click SAP ECC PP 配置文档 and enter planning scope name with description

Select the scope name and double click SAP ECC PP 配置文档


SAP ECC PP 配置文档



4.9 creation indicator


Menu Path

IMG  Production Material Requirements Planning  Planning   define creation indicator


Transaction Code:




Assign creation indicator for MRP group as below


SAP ECC PP 配置文档



4.10 Planning Horizon for plant and MRP Group


Menu Path

IMG  Production Material Requirements Planning  Planning   MRP calculation  Define Planning Horizon


Transaction Code:

OMDX


SAP ECC PP 配置文档


Choose plant or MRP group buttom

Then entry 999 for planning horizon(planning horizon specifies the period for the "Net change planning in the planning horizon)


SAP ECC PP 配置文档




4.11 Define floats(Scheduling Margin Key)


Menu Path

IMG  Production Material Requirements Planning  Planning   Scheduling and Capacity parameters Define floats(Scheduling Margin Key)


Transaction Code:

OPPQ




SAP ECC PP 配置文档



column

Description

remark

Plant

Plant: 1166 or 2226


Name1

Plant description


SMKey

Scheduling Margin Key


Op.pd.

Opening period(in days)


FlbefProd.

Float before production (in days)


FlAftProd.

Float after production (in days)


ReleasPer.

Release period(in days)







4.12 Define scheduling parameters for planned orders


Menu Path

IMG  Production Material Requirements Planning  Planning   Scheduling and Capacity parameters Define scheduling parameters for planned orders


Transaction Code:

OPU5



SAP ECC PP 配置文档



Select records for displaying

Click SAP ECC PP 配置文档

SAP ECC PP 配置文档SAP ECC PP 配置文档



field

Description

remark

Plant

Plant: 1166 or 2226


Order type

Production order type

For all production order(*)

ProdScheduler

Production scheduler


Sched.hor.det.

Scheduling horizon(detail planning)

The scheduling horizon is a time period that is in working days. The scheduling horizon is only in effect, if the Scheduling indicator has been set. Enter 999

SelID:detailed

Select ID for routing selection

SAP ECC PP 配置文档

Rate.plng orzn



SelID: rate plng



Rcutplg horizon



selID: roughplng



Scheduling level

scheduling level for adjusting basic date

Determines which scheduling (detailed scheduling or rate-based scheduling) level is used for adjusting the basic dates when you  carry out lead time scheduling or dispatching within capacity planning.

Adjust dates

Adjust dates in lead time scheduling


For capacity scheduling

Adjusting dates when dispatching planned orders


Scheduling type

Key which specifies the scheduling type for detailed scheduling

Use capacity requirement to be scheduling type

Start in the past

Maximum number of days start date can be in the past


Reduction type



Maximum reduction level



% reduction in floats








4.13 Define External procurement


Menu Path

IMG  Production Material Requirements Planning  Planning   Procurement Proposals Define External procurement


Transaction Code:

OMDT


SAP ECC PP 配置文档


Click SAP ECC PP 配置文档 to define external procurement for MRP group PURC



SAP ECC PP 配置文档



field

Description

remark

Plant

Plant: 1166 or 2226


Name

Plant description


MRP group

MRP group


MRP group name

MRP group description


Sched.info rec/agr.

Scheduling according to purchasing info record or agreement

the system checks whether a planned delivery time is entered in the purchasing info record or in the outline agreement. This planned delivery time is then used to calculate the delivery date and the release date.

Stnd purch.ordr

Document type for Standard PR

SAP ECC PP 配置文档

Doc.type subc.

Doc.type PR for subcontracting

SAP ECC PP 配置文档

Stock trans doc

Doc.type PR for stock transfer

SAP ECC PP 配置文档





4.14 Define BOM and routing selection


Menu Path

IMG  Production Material Requirements Planning  Planning   BOM explosion/routing determination Define BOM and Routing selection


Transaction Code:





you specify the priority with which a BOM usage or routing usage is selected during the planning run. Here, a sequence is usually determined which is used to select a valid BOM or routing via the criterion "Usage".



SAP ECC PP 配置文档





BOM selection ID: SAP ECC PP 配置文档


Routing selection ID: SAP ECC PP 配置文档



4.15 Activate Runtime statistics


Menu Path

IMG  Production Material Requirements Planning  Planning  Activate Runtime statistics


Transaction Code:




SAP ECC PP 配置文档


Set 1 for Frequency : Value which determines if an entry is made in the runtime statistics for a particular material during the planning run, if the value is 1 then an entry is created for every material.




4.16 Define storage location MRP per plant


Menu Path

IMG  Production Material Requirements Planning  Planning  Define storage location MRP per plant

Transaction Code:



SAP ECC PP 配置文档



Enter plant: 1166 or 2226

Then click SAP ECC PP 配置文档

SAP ECC PP 配置文档





4.17 Define availability Check for Components


Menu Path

IMG  Production Material Requirements Planning  Procurement Proposals  Define availability check for components

Transaction Code:

OPPJ




SAP ECC PP 配置文档








Click SAP ECC PP 配置文档


SAP ECC PP 配置文档


For PP module we use PP checking rule to check availability. This rule defines the checking procedure to be used for the availability check (or in Inventory Management, the missing parts check) in individual applications.


Check SAP ECC PP 配置文档

SAP ECC PP 配置文档

Select record then click SAP ECC PP 配置文档


SAP ECC PP 配置文档




Click SAP ECC PP 配置文档



SAP ECC PP 配置文档


Click SAP ECC PP 配置文档


SAP ECC PP 配置文档


Select MRP group PURC then click SAP ECC PP 配置文档


SAP ECC PP 配置文档




4.18 Define order type for conversion to production/process order


Menu Path

IMG  Production Material Requirements Planning  Procurement Proposals  Convesion of Procurement proposals  define order type for conversion to production/process order

Transaction Code:

OPPE








SAP ECC PP 配置文档


Click SAP ECC PP 配置文档


SAP ECC PP 配置文档


Plant:1166 ; order type when convert planned order to production order is ZEP1

Plant: 2226; order type when convert planned order to produciton order is ZSP1


SAP ECC PP 配置文档




Click SAP ECC PP 配置文档




SAP ECC PP 配置文档




Select MRP group PURC then click SAP ECC PP 配置文档


SAP ECC PP 配置文档









4.19 Define conversion of planned order into Purchase requisitions


Menu Path

IMG  Production Material Requirements Planning  Procurement Proposals  Convesion of Procurement proposals  define conversion of planned order into purchase requisitions

Transaction Code:

OMDV



SAP ECC PP 配置文档



Click SAP ECC PP 配置文档


SAP ECC PP 配置文档


Enter max. no . of planned order can be read


Click SAP ECC PP 配置文档


SAP ECC PP 配置文档






4.20 Define period display for period totals


Menu Path

IMG  Production Material Requirements Planning  Evaluation  Period totals  define period display for period totals

Transaction Code:




Grouping periods specify which periods are to be displayed in the period totals display of the MRP list and the stock/requirements list. If you want to split the monthly or the weekly display into a finer split, you must define this split in the section Define Individual Period Split for Period Totals(can go to Material  Requirements Planning  Evaluations Period totals define individual period split for Period totals).

SAP ECC PP 配置文档



Default Settings


The following default values are specified in the standard SAP R/3 System:

Day

Week

Month

These periods are always displayed.


SAP ECC PP 配置文档





4.21 Define Receipt Elements for Receipt Days’ Supply


Menu Path

IMG  Production Material Requirements Planning  Evaluation  Define receipt Elements for Receipt Days’Supply

Transaction Code:



SAP ECC PP 配置文档


Click SAP ECC PP 配置文档






SAP ECC PP 配置文档








4.22 Define Parallel Processing in MRP


Menu Path

IMG  Production Material Requirements Planning  Define Parallel Processing in MRP


Transaction Code:



With the help of parallel processing procedures, you can significantly improve the runtime of the total planning run.To process in parallel, you can either select various sessions on the application server or various servers.



SAP ECC PP 配置文档



Select Destination for parallel processing* and enter no. of sessions



* Destination of parallel processing check from transaction SM59 (RFC destinations  Internal Connections)


4.23 Define Error Processing in the Planning Run


Menu Path

IMG  Production Material Requirements Planning  Planning  MRP Calculation  Define Error Processing in the Planning Run

Transaction Code:

OMDY


SAP ECC PP 配置文档



Click Planning run button.


SAP ECC PP 配置文档


Maintain Maximum of /purchase/planned order

Plant 1166 and 2226 =  999

However, you should check with user it may cause by user choose improper lot size (example lot “FX” : Fix lot size).  For example: They require 10000 PC, but they maintain fix lot size/maximum lot size at 10 PC, so the system generate 1000 planned orders which is too much than limit.


5. Shop Floor Control


5.1 Master Data


5.1.1 Define order types


Menu Path

IMG  Production Shop Floor Control  Master data  Order Define Order types

Transaction Code:

OPJH



No.

Order type

Description

1

ZEP1

MECT-Normal production order

2

ZET1

MECT-Trial production order

3

ZSP1

MSFT-Normal production order

4

ZST1

MSFT-Trial production order



 For create the new order type start by click SAP ECC PP 配置文档 or will copy from old order type to create the new order type by click on toolbar.


SAP ECC PP 配置文档


 Order Category: 10 ( PP Production Order) System fix value for this field

 Order type: define the order type and description

 CO partner update: Semi-active

 Residence time 1: (gap between deletion flag and deletion indicator setting)

 Residence time 2: 6(one month gap between deletion indicator setting and reorganizing)

 Settlement Profile: TPP01 (TH Normal Production Order)

 StatusProfile Header:

 Save the data by click SAP ECC PP 配置文档


SAP ECC PP 配置文档


Remark for Thailand:

1. For Trial production order type จะsettlement profile เป็น TPP2 (TH Trial Production Order)

2. You must be checking the number range each of order types when have to create new order.






















5.1.2 Define order type-independent parameters


Menu Path

IMG  Production Shop Floor Control  Master data  Order Define Order types-independent parameters

Transaction Code:

OPL8






No.

Plant

Order type

Planning

Implementation

Controlling

Display profile

1

1166

ZEP1

Define master data




2

1166

ZET1

3

2226

ZSP1

4

2226

ZST1



 For create new plant by click SAP ECC PP 配置文档 or you can copy by click


 Click at Planning tab


SAP ECC PP 配置文档



Production version: 0 (Automatic selection of production version)

Application: P (Routing for production)

Selection ID: Z3

Routing selection: 3

Tick alternative Sequences

Task list type: N-routing

Tick Entry tool

Oper./act. Increment: 0010

BOM application: PP01 Production-general

Reservation/purc.req. 3-immediately

Inspection Type : 03 (In-process insp. For manufacturing order)


 Click at Implementation tab


SAP ECC PP 配置文档



 Click at Controlling tab


SAP ECC PP 配置文档


Cstg variant planned: TP01- TH Production Order plan

Cstg variant actual: TP02- TH Production Order actual

Results analysis key: 000001- TH WIP-Production

Planned cost calculation: 2 Determine planned costs when saving

Distribution Rule(default rule): PP1-Production Mat. Full settlement


 Click at Display profiles tab


SAP ECC PP 配置文档


Graphics profile : 000001

Group : PP

Name STANDARD

Index : 2

Missing part list order no. : 000001 Profile 1 Availability check for Plan/prod.order

Missing part profile. : 000002 Profile 2 Availability collective order

Goods movements  : 000001 Standard profile



And then click save  SAP ECC PP 配置文档


SAP ECC PP 配置文档








5.1.3 Define Status Profile(not yet finish)


Menu Path

IMG  Production Shop Floor Control  Master data  Order Define Status Profile

Transaction Code:

BS02


 Click SAP ECC PP 配置文档 เพื่อสร้าง user status profile ใหม่


SAP ECC PP 配置文档



 กรอกรายละเอียด จากนั้น click SAP ECC PP 配置文档


SAP ECC PP 配置文档


Field

Description

example

Status Number

ลำดับของ user status ใน status profile

1,2,3,…

Individual Status

Status of object


Short text

Individual status description


Long text

สามารถใน status description เป็นแบบ long text ได้


Init. status

เมื่อ tick status ตัวนั้นจะเป็น Initial status


Lowest status no.

เนื่องจาก objectสามารถมีได้หลาย status ดังนั้น การกำหนด lowest status และ highest status จึงเป็นการกำหนด ว่าจะให้ object ใน status ไหน active ในกรณีที่มี object ตัวนี้อยู่หลาย status


Highest status no.


Position

Position of the status in the status display


Priority

Status display priority at a particular position(in case that there is the same position)


Auth. code

authorization key



 เลือก object types สำหรับแต่ละ user status โดย  SAP ECC PP 配置文档


SAP ECC PP 配置文档

 เลือก  order types ตามนี้ สำหรับ user status profile

CO production order

PP/PM: Operation

PP/PM: order header

 Click SAP ECC PP 配置文档 หรือ SAP ECC PP 配置文档  มาที่ Change status profile: user profile screen จากนั้น double click แต่ละ user status  เพื่อสร้าง Business transaction control

 กด SAP ECC PP 配置文档  ที่ Business transaction control screen

SAP ECC PP 配置文档


Field

Description

example

Business transaction

SAP Business transaction


No influence

ถ้า tick จะเป็นการระบุว่า this status ไม่ influence business transactionนี้


Allowed

ถ้า tick จะเป็นการระบุว่า business transaction นี้จะใช้เมื่อ this status is active.


Warning

ถ้า tick จะเป็นการระบุว่า business transaction นี้จะใช้เมื่อ this status is active และมี warning message


Disallowed

ถ้า tick จะเป็นการระบุว่า business transaction นี้จะไม่สามารถใช้ได้ เมื่อ this status is active


No action

ถ้า tick จะเป็นการระบุ No follow-up action


Set

ถ้า tick the status จะถูก activated เมื่อ this business transaction is carried out



สำหรับ user status REL เลือก ดังนี้


SAP ECC PP 配置文档


 กด SAP ECC PP 配置文档 หรือ SAP ECC PP 配置文档  ไปยัง user status ต่อไป


สำหรับ user status TECO เลือก ดังนี้

SAP ECC PP 配置文档


 จากนั้น SAP ECC PP 配置文档


SAP ECC PP 配置文档




5.1.4 Define Number ranges for orders


Menu Path

IMG  Production Shop Floor Control  Master data  Order Define Number ranges for orders

Transaction Code:

CO82


 Number ranges for MECT and MSFT: 11000000000 to 19999999999



 Click  SAP ECC PP 配置文档


SAP ECC PP 配置文档


 Click SAP ECC PP 配置文档 for  Number range overview

SAP ECC PP 配置文档


 Click SAP ECC PP 配置文档 for number range group maintaining


SAP ECC PP 配置文档

Production order type which has not been assigned as below;


SAP ECC PP 配置文档


in case of  insert number range group; select Group->insert from menu bar


SAP ECC PP 配置文档


insert values


SAP ECC PP 配置文档


then SAP ECC PP 配置文档

o assign order type to number range group; select the order type then click SAP ECC PP 配置文档


SAP ECC PP 配置文档


select the group by  SAP ECC PP 配置文档 in front of the number range group  and  click at SAP ECC PP 配置文档




 then SAP ECC PP 配置文档



SAP ECC PP 配置文档



5.1.5 Define Production Scheduling Profile


Menu Path

IMG  Production Shop Floor Control  Master data Define Production Scheduling Profile

Transaction Code:

OPKP



SAP ECC PP 配置文档




 Click SAP ECC PP 配置文档



SAP ECC PP 配置文档


 Plant: MECT or MSFT Plant

 Production Scheduling Profile: 000001 Production Scheduling Profile 1

 At Material availability check: tick on Confirm av. Partial qty.

 Overalll profile for Capacity planning: SAPCRPG001 Cap. evaluation: Wk. cntr. view (graph.)

 Comfirm capacity: tick

 Finite scheduling: checked

 Confirmation

Tick No update of Yield Surplus

Tick Adjust Quantities in order to Actual values


 then SAP ECC PP 配置文档




5.1.6 Define Production Scheduler


Menu Path

IMG  Production Shop Floor Control  Master data Define Production Scheduler

Transaction Code:

OPJ9



 Click SAP ECC PP 配置文档


Field

Description

example

Plant

Mahle plant

MECT, MSFT

Production scheduler

Production scheduler code

100

Production scheduler Description

Production scheduler Description

Production Planning

Prodprof

Production Scheduling Profile

000001

Descr.prod. profile

Description of Production Scheduling Profile

Production Scheduling profile 1


 จากนั้น SAP ECC PP 配置文档


SAP ECC PP 配置文档
















5.2 Operation


5.2.1 Define Checking Control


Menu Path

IMG  Production Shop Floor Control  Operations Availability CheckDefine Checking control

Transaction Code:

OPJ9



SAP ECC PP 配置文档






 Click SAP ECC PP 配置文档


 assign business function to  2 cases (order creation and order release) for each production order type



 Order Creation


SAP ECC PP 配置文档


Plant: 1166 or 2226

Order type: Production order type

Business function.: 1-Check availability during order creation

At Material availability area

 Checking rule: PP ( PP checking rule )

 Type comp. check: ATP check

 Collect. Conversion: 2-creation even though no material is available

PRT availability

 Tick no check

Capacity availability

 Overall profile: SAPSFCG013 SFC-Capacity availablity check>=3.0D

 Release Capacity: 1- User decides on creation if capacity is missing

จากนั้น SAP ECC PP 配置文档





 Order Release


SAP ECC PP 配置文档












5.2.2 Define Scheduling Parameters for Production Order


Menu Path

IMG  Production Shop Floor Control  Operations SchedulingDefine Scheduling Parameters for Production Order

Transaction Code:

OPU3


SAP ECC PP 配置文档





 Click SAP ECC PP 配置文档


SAP ECC PP 配置文档


 จากนั้น SAP ECC PP 配置文档



field

Description

remark

Plant

Plant: 1166 or 2226


Order type

Production order type

For all production order(*)

ProdScheduler

Production scheduler


Sched.hor.det.

Scheduling horizon(detail planning)

The scheduling horizon is a time period that is in working days. The scheduling horizon is only in effect, if the Scheduling indicator has been set. Enter 999

SelID:detailed

Select ID for routing selection

SAP ECC PP 配置文档

Rate.plng orzn



SelID: rate plng



Rcutplg horizon



selID: roughplng



Scheduling level

scheduling level for adjusting basic date

Determines which scheduling (detailed scheduling or rate-based scheduling) level is used for adjusting the basic dates when you  carry out lead time scheduling or dispatching within capacity planning.

Adjust dates

Adjust dates in lead time scheduling


For capacity scheduling

Adjusting dates when dispatching planned orders


Scheduling type

Key which specifies the scheduling type for detailed scheduling

Use capacity requirement to be scheduling type

Start in the past

Maximum number of days start date can be in the past


Reduction type



Maximum reduction level



% reduction in floats
























5.2.3 Define Confirmation Parameters


Menu Path

IMG  Production Shop Floor Control  Operations ConfirmationDefine Confirmation Parameters

Transaction Code:

OPK4


SAP ECC PP 配置文档




 Click SAP ECC PP 配置文档


 Click Generally valid settings tab SAP ECC PP 配置文档


SAP ECC PP 配置文档




Plant: 1166 or 2226

Order type: Production order type

At checks area:

 Operation Sequence : check of operation sequence in order

 Under delivery : Defines how the system is to react during confirmation if the yield and the rework quantity fall below the order's underdelivery tolerance when the operation is finally confirmed

 Over delivery : Specifies what the system should do if the overdelivery tolerance of the order is exceeded by the confirmed yield and rework quantity during confirmation

 QM results rec.: Controls the system message that appears when you confirm an order, if QM inspection results must be recorded for an operation but no results are available yet.

 SAP ECC PP 配置文档Determines whether dates in the future can be used in a confirmation (Recommend Should not Tick)

Propose time units: tick at automatic optimization


 Click General individual entry tab SAP ECC PP 配置文档


SAP ECC PP 配置文档


Confirm. Type: 1 Automatic final confirmation

At Error handling/logs area

 Tick at Act. Costs

 Tick Goods movements


 Click Operation indv. Entry using initial scrn. Tab SAP ECC PP 配置文档


SAP ECC PP 配置文档

 

 จากนั้น SAP ECC PP 配置文档






5.2.4 Define Single Screen Entry


Menu Path

IMG  Production Shop Floor Control  Operations Confirmation Single Screen EntryDefine Single Screen Entry

Transaction Code:

OPK0




 Click SAP ECC PP 配置文档


SAP ECC PP 配置文档




 Profile: Z00001

 Profile Description: Conf. profile for single screen entry

 SAP ECC PP 配置文档

 AT Area Selection tab

Header area: 0113 Confirmation/Order/sequence/operation/work center

Click SAP ECC PP 配置文档 to preview  header area

SAP ECC PP 配置文档


 At detail Area as below


Click SAP ECC PP 配置文档 to preview each detail area


SAP ECC PP 配置文档


click SAP ECC PP 配置文档


SAP ECC PP 配置文档



 choose Default tab SAP ECC PP 配置文档


SAP ECC PP 配置文档


Confirm. type: Automatic final confirmation

Quants: No proposal

Services: 1 Immediate proposal


 then SAP ECC PP 配置文档




 Tick SAP ECC PP 配置文档at standard profile to assign the profile for confirmation profile


SAP ECC PP 配置文档





















5.2.5 Reason code confirmation


Menu Path

IMG  Production Shop Floor Control  Operations ConfirmationDefine Reasons for variances

Transaction Code:

OPK5


 List of error code for 1166 plant

SAP ECC PP 配置文档

SAP ECC PP 配置文档

SAP ECC PP 配置文档

SAP ECC PP 配置文档

SAP ECC PP 配置文档

SAP ECC PP 配置文档

SAP ECC PP 配置文档


Etc.


SAP ECC PP 配置文档

SAP ECC PP 配置文档

SAP ECC PP 配置文档

SAP ECC PP 配置文档

SAP ECC PP 配置文档




 List of error code for 2226 plant

SAP ECC PP 配置文档

SAP ECC PP 配置文档



 Click SAP ECC PP 配置文档


Field

Description

Remark

Plant

1166 or 2226 plant


Name 1

plant description


Reason for variance

Reason for variance code


Description

Reason for variance description


 

 จากนั้น SAP ECC PP 配置文档


SAP ECC PP 配置文档

















5.3 Integration


5.3.1 Define Account Assignment Cat. & Doc. Type for Requisitions


Menu Path

IMG  Production Shop Floor Control  Integration Define Account Assignment Cat. & Doc. Type for Requisitions

Transaction Code:

OPJP



SAP ECC PP 配置文档


Enter NB-purchase requisition for Document type in production order category.





SAP ECC PP 配置文档

看后分享


相关文章: