【发布时间】:2016-08-02 21:28:32
【问题描述】:
我遇到了负载测试“预热”期的问题,用户负载增加得非常缓慢,或者有时直到预热期结束后才开始加速。我的测试组合包括一个初始化测试、五个运行持续时间测试和一个终止测试。负载测试模式基于用户节奏。这是测试混合比例:
[Initialize]
- Test 1 (0.2 per user per hour)
- Test 2 (0.1 per user per hour)
- Test 3 (0.15 per user per hour)
- Test 4 (0.25 per user per hour)
- Test 5 (0.1 per user per hour)
- Test 6 (0.2 per user per hour)
- Test 7 (0.125 per user per hour)
[Terminate]
Load Pattern:
- Initial User Count 1
- Maximum User Count 100
- Step Duration 10
- Step Ramp Time 5
- Step user Count 20
Run Time:
- Cool Down 15 mins.
- Run Duration 1 hour.
- Warm-up Duration 10 mins.
任何帮助将不胜感激!
【问题讨论】:
标签: visual-studio load-testing